New Jupiter bridge on U.S. 1 planned for 2020, cost is about $90M

 

A state study done about three years ago determined the bridge could be repaired. But a more detailed state study, completed afterward, determined that the bridge must be replaced. (Source: The Palm Beach Post)

From The Palm Beach Post: For bicycle riders going back and forth from A1A in Jupiter to Jupiter Island and Martin County, there are no bicycle lanes on the bridge. Many walk their bikes across the span.

Replacement of the U.S. 1 bridge over the Loxahatchee River in Jupiter is planned for around 2020 and is expected to cost about $90 million, according to state transportation officials.

For the complete story: http://www.palmbeachpost.com/news/news/new-jupiter-bridge-on-us-1-planned-for-2020/nrKNK/

Related posts:


Comments are closed.